Protech-PAS---TC-Install

Mining & Resources

With a range of experience working with industry leaders in the mining and resources sector, Protech PAS is well versed in providing high voltage and electrical solutions from fixed plant shutdowns to design, installation and commissioning of new facilities and upgrades to existing plant.

Protech PAS specialise in:

  • High voltage transformer testing
  • Maintenance
  • Condition assessments
  • Protection testing
  • Verification
  • New upgrades
  • Switchboard condition assessments
  • Testing and commissioning
  • Shutdown planning and project management

Protech PAS has done some major projects in Australia and offshore with new upgrades, testing and commissioning. Some of these scopes of work include:

  • Planning and execution of routine shutdowns including shutdowns on major equipment ranging from processing plants, underground reticulation, grinding mills, wash/water treatment plants, paste plants and high voltage kiosks
  • Design, installation and commissioning of 3 new 66kV substations for coal mines, which include earth grid protection and new protection switchboards for the expansion of the coal mine (Brownfield Project)
  • Execute maintenance testing on high voltage switchboards on mobile plant and replacement of faulty high voltage equipment
  • High voltage infrastructure installation for major processing plants and mines across Australia

Our highly capable team of engineers and technicians have extensive experience in:

  • RPEQ signoff
  • Commissioning
  • High voltage transformer overhauls, repairs and testing
  • Maintenance
  • Condition assessments
  • Protection testing
  • Verification of existing systems
  • New upgrades
  • Switchboard condition assessments and testing
  • Full power systems engineering and design
  • Generator, transmission and distribution protection upgrades
  • Oil analysis, filtration and reclamation
  • SF6 gas analysis and reclamation