Protech PAS provided 10 technicians over a six month period to cover multiple planned outages at the Diamantina and Leichhardt Power Stations in Mt Isa
Protech Power International Technicians conducted inspections and performed maintenance on the Diamantina and Leichhardt Power Stations equipment. This was the first significant planned maintenance periods since commissioning.
Inspections and testing was successfully completed on all the main equipment including the step up main transformers (11/132kV), switchyard equipment (132kV) circuit breakers and overhead switchgear, auxiliary transformers (11/6.6kV), medium voltage switchboards, larger medium voltage motors and drives and the equipment testing of protection relays for the generators, lines and services equipment.